The swim ladder needed a revision. So break it down and make an inventory. IMG_0925IMG_0927 Two steps are in order, two must be patched and one must be build new. After all steps had passed through the thickness planer, new pieces of teak were fitted and glued to the steps. The new stage was roughly cut. Then the grooves were milled again. IMG_0946Ultimately, everything sanded, oiled and put back together. IMG_0948So the swim ladder can be refitted to Fuchur in spring.

Categories: Allgemein

0 Comments

Leave a Reply

Your email address will not be published. Required fields are marked *