Own Label

I thought, if each manufacturer has his own label, why not me? I also produce something! So I build a header for the soldering iron (thanks Günni!), with which I now decorate my sewing.

Refit of the swim ladder

The swim ladder needed a revision. So break it down and make an inventory.  Two steps are in order, two must be patched and one must be build new. After all steps had passed through the thickness planer, new pieces of teak were fitted and glued to the steps. The new stage was Read more…

Launching the boat

From 17th – 19th october, the boats came ashore. Actually, for the end of the season nothing special. But this time with the new system blocks and the truck. How it worked, the small film is showing .