Own Label

I thought, if each manufacturer has his own label, why not me? I also produce something! So I build a header for the soldering iron (thanks Günni!), with which I now decorate my sewing.

Sleeve Protection for Roller Furled Genoa

The first part of sewing is finished! During the winter the cockpit tent, the sail dress, the railing dress, the tiller dress, two covers for the winches and the sleeve protection for the roller furled genoa shall be sewn. I started with the sleeve protection for the roller furled genoa. Long straight seams are just the right home for the following projects. The cutting went pretty well with the help of a laser. Even the sewing was not the big problem. Now the Read more…

Refit of the swim ladder

The swim ladder needed a revision. So break it down and make an inventory.  Two steps are in order, two must be patched and one must be build new. After all steps had passed through the thickness planer, new pieces of teak were fitted and glued to the steps. The new stage was roughly cut. Then the grooves were milled again. Ultimately, everything sanded, oiled and put back together. So the swim ladder can be refitted to Fuchur in spring.

New section in the mediathek

In the library there is a new heading “Other owner of a Jaguar 25“. Here I want to collect photos from other Jaguar 25, with details of owners, ship name and port. Let’s see how many Jaguars will be over time. So Jaguar 25 Skipper, please send photos. Thanks in advance.

Launching the boat

From 17th – 19th october, the boats came ashore. Actually, for the end of the season nothing special. But this time with the new system blocks and the truck. How it worked, the small film is showing .