Painting

After 37 years, the boat had to be painted inside . The preparations for this were, however, very time expensive. Unscrew everyting, fill, sand and glue, took significantly longer than planned. But thats the way it is! The result can be seen, however.

Installation of fuel cell

Another step is done. The fuel cell is installed. This required a lot to be rebuilt on board. As a locker was released by the reconstruction of the oven, I have now installed the entire electrical system here. But since there was not enough space due to the hull shape, I Read more

Inspection hatch for the water tank

The next point of the spring campaign was the installation of an inspection hatch for the water tank. The old hatch was made of plastic glas. You could easily see whether the tank was cleaner not, but not clean it without loosening a lot of screws. That’s why I needed a new Read more